Xi'an Decoration Classroom: Spring Pavement Floor to Pick Sunny Days



When the spring breeze blows, everything wakes up. But there is still moisture following the spring blossoms. In this stage, wood flooring is susceptible to mildew, rot, and deformation, which not only affects the normal use of the floor, but also breeds harmful bacteria and parasites, causing allergic reactions in humans, and is particularly detrimental to the elderly and children. Paving wood floors have special skills this season. Let's take a look at the decorator's suggestions.

First of all, in the floor purchase above, we must consider the floor of the material, paint technology, design style, but also to choose a large brand, with moisture-proof products. The floorboards of well-known enterprises are witnessed by the quality of hundreds of thousands of families and are guaranteed in terms of quality; at the same time, when the regular brands select raw materials, they are generally dried in advance and are taken during the production, transportation and storage. Moisture protection measures. At the time of purchase, everybody can ask the merchant to check the humidity of the floor with a hygrometer. The national regulations stipulate that the moisture content of the standard sheet does not exceed 12%. The high-quality floor uses a high-density substrate, and the water-absorption thickness expansion ratio is far less than the national standard.

Second, for floor installation, wood floor coverings require professional installation workers and supervision must be implemented. Pave the floor from the door to the room, and leave a gap of about 8 mm at the junction of the floor and the wall. This will allow the floor to have a flexible space where thermal expansion and contraction may occur, and prevent the floor from arching or warping. .

Finally, experts have warned that there is much rain in spring and there is a large temperature difference between day and night. Therefore, it is necessary to pay attention to the selection of suitable time in the floor paving to be able to do a good job of moisture-proof work. The time for paving the floor was chosen in sunny weather, and the floors were dried after the ground was dry. Within 48 hours after floor pavement, avoid walking and placing heavy objects on the floor. Allow some time for the floor to stabilize.

Nature Flooring Del Floor Space Decorative Paint Door

Half Power Output Emergency Driver

Half Power Output Emergency Driver,Emergency Backup Drivers,Half Power Emergency Led Driver,Emergency Power Led Kit

JIALINGHANG ELECTRONIC CO.,LTD. , https://www.jlhemergencylighting.com