Xi'an decoration classroom Chen Gong decoration must know
1. Pre-design - 2. The main demolition - 3. Hydroelectric reform - 4. Carpentry - 5. Tiling - - 6. Brush wall paint - 7. Kitchen ceiling - 8. Cabinet installation - - 9. Wood door installation - 10. Floor installation - 11. Paving wallpaper - 12. Radiator installation - 13. Switch socket installation - 14. Lamp installation - 15. Hardware sanitary installation - - 16. Curtains Rod installation - 17. The pioneering cleaning - 18. Furniture approach - 19. Appliance installation - 20. Home accessories ¬
Renovation is basically done in accordance with these 20 steps. In the following, I will try my best to explain the decoration process that I know so far as well as the details that need attention in the whole process....
(1) The pre-design, the same as the construction, is the difference between the human and the bee. The construction of the bees is a reflection of instincts. Before the humans are built, the ideas and frameworks are first formed in the mind. Therefore, if the home improvement compared to a battle, then the pre-design home improvement is the battle of the "war plan" is the home improvement "soul link." Therefore, what is said in the last article "Tang Liang Manufacturing" in the last chapter is all about the issues that need to be taken care of in the early design, and it will not be repeated here. ¬
One of the things to do in the early design is to conduct a detailed measurement of your room. The main contents of the measurement include: ¬
1. Identify the area involved in the renovation process. Especially tiling area, wall paint area, wallpaper area, floor area; ¬
2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later. ¬
I remember that when my foreman at last told me to lay out the total amount of bricks according to the “actual amountâ€, he measured 10 square meters more than the area I measured. I was really dumbfounded. After re-measurement, the foreman returned to reprimanding the bricklayer and said: "How do you measure?!" This is why I suggest that you measure yourself. Many places are decorated with the same reason as human beings - we don't necessarily understand it, but we must have a few. ¬
Remind everyone, do not forget to go to the property before the start of construction formalities, pay a decoration deposit. ¬
(II) The main dismantling ¬ entered the construction stage, and the main dismantling and reform is the first one on the project. It mainly includes the demolition of walls, masonry walls, shoveling of wall coverings, demolition of heating, and replacement of plastic steel windows. When the main body is dismantled and reformed, it is to put the framework of the construction site first. ¬
(3) Before the hydropower reform ¬ water circuit transformation, the main structure demolition reform should be basically completed. Between the two stages of hydropower reform and main body demolition and reform, some students may know that the first measurement of cabinets should also be conducted. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not processed, the cabinet designer can not give a specific design size, but only for the developer reserved water inlet, hood socket Location, make some suggestions. Mainly include: ¬
1, to see if the position of the hood socket affect the installation of the hood; ¬
2, see if the location of the water meter is appropriate; ¬
3, to see if the position of the inlet is convenient for installing the sink later. ¬
For the first measurement of the cabinet, slightly experienced students can do it completely. After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof. ¬
Some people think that before the renovation starts, some main materials should be advanced. What I want to say is that, unless it is the main material needed for the demolition of the main body, the entry time of main materials such as tiles and large core boards should be after the hydropower reform. Because the circuit modification involves ground slotting, if tiles or large core boards are improperly positioned, it is troublesome for workers to move in and out. Two days ago, the "rat" classmate also told me that her family had encountered the problem of the workers returning from the room full of bricks, reminding the students to pay attention. ¬
¬ (four) woodworking ¬carpentry, bricklayers, oil workers is the construction of the "three brothers", the basic order of appearance is: wood - tile - oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is above" is also one of the basic principles that determine the order of home improvement. I will mention it later. ¬
In fact, carpentry activities such as installing standpipes, making decorative ceilings, and attaching plaster lines can be considered in a sense as a detailed link of the main demolition and reform. They themselves do not conflict with the transformation of water circuits, and sometimes they still need some. Cooperation, as mentioned in my last post, “If you are planning to make a false wall at home, consider whether there is a hydropower circuit on the false wall. If there is, you should let the hydropower reform workers pre-manage.†¬
(5) tiling If the workers are too busy, the foreman will normally allow the tiler to enter the tiling when the “wooden boss†is not over. This is normal, because there is no conflict between the two. ¬
In the process of bricklayers' second job, the following three steps are also involved: ¬
1. The installation of door stone and marble windowsill. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now. ¬2. Floor drain installation. The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. Therefore, when the students started to visit the building materials, they should buy land drains as early as possible. ¬
3, hood installation. The hood is the first appearance of the appliance. After the kitchen tiles are laid, you can consider installing the hood. ¬
“The bricklayer's second cousin†leaves the floor. At this time, the cabinet can be measured for the second time. Accurately speaking, after the wall tiles have been attached and the hood is installed, the second measurement of the cabinet can be performed. ¬
¬ (six) brush wall paint ¬
The “oil worker's third child†entered the field and mainly completed the work of basic wall surface treatment, brush finish, and painting of furniture hit by the “wooden bossâ€. To prepare wallpapers for students, you only need to let the “oil worker†in the plan to do wallpaper on the wall. As for whether or not to stay in the paint for the last time, I personally feel that this problem is not necessarily too true. From the experience of my renovation, the significance of leaving the paint once again is not great, because the operation behind it is no more messy than painting. . ¬
When the “bossâ€, “second child†and “third child†have left the field one after another, many students will think that their decoration is almost over. In fact, if the number of links is counted, one-third is not enough. The reason why everyone has this feeling is that people generally understand the decoration is only the decoration of the "construction part", in fact, the decoration of the "installation link" is also the focus of decoration. ¬
If the "design link" is to "conceive" the look of our future home, then the "construction link" is to "package" our home, and really say that "home-made" homes are almost all in the "installation phase." Drink saliva and continue... ¬
(seven) kitchen ceiling ¬cabinet ceiling as an installation took the lead, or continue to the family's "packaging." At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is best for students to install ceiling lights and exhaust fans (bath heaters) at the same time, or to leave heads and openings. ¬
I am a firm advocate of "outsourcing", even if the foreman and I promised him how to do the worker's hydropower reform, how to regulate the installation of the aluminum pinch, how to make the wooden door strong, and how the wallpaper sticker was professional, How can cabinets be practical? In my opinion, what the decoration team can do is carpentry, tiling, and painting. Because I believe that professional construction, I believe that the manufacturers of the installation level, believe that the product line of production, most of the manual than the decoration team workers slightly better. The decoration is like a game. The gambling is the workmanship of the workers. Therefore, betting on “My workers are construction geniuses†is not practical in my heart. ¬
The reason why many students let decoration companies and decoration teams undertake a large number of construction tasks is because, on the one hand, their own time is not plentiful, and one reason is because they consider the problem of “construction of projectsâ€. I originally decided to outsource hydropower reform, and my neighbors reminded me that it is troublesome to link up later. ¬
In fact, every aspect of the decoration is very independent. I remember that there were questions from the students in the forums of the former part of the South. He said that his home was renovated, and every link was made by the owners asking for special workers. Home decoration is such a thing, it really does not have any convergence at all, on the contrary, the classmates themselves should try to play the so-called "cohesion" in the home improvement process, accurately grasp the choice of materials, master some simple construction process, handle well This is the key to the relationship between workers, etc. ¬
Really want to say that because of the problem of “convergenceâ€, such as the question of who will be responsible for the installation of the sanitary ware, lamps, and hardware in the later period, it depends on you and the workers to see whether there is anyone willing to “control†you. On the other hand, when it comes to the number of people who did not "control," I still say that "Since God invented money, there was no problem that could not be solved." ¬
Decoration, quality is always ranked first, is the main contradiction, is the principle. Some links are secondary because of the problem of "convergence." Students must be cautious while preparing for major contradictions and major concessions because of minor contradictions. ¬
¬ (8) Kitchen Cabinet Installation ¬ After the ceiling is over, the cabinet door can be installed. If it goes well, one day can be completed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas. ¬
Just mentioned the ceiling, there is a problem worthy of everyone to discuss, many students kitchen and toilet ceiling selection waterproof gypsum board with waterproof paint, decoration team offer is generally more than 120 yuan per square meter, than the general aluminum buckle, PVC buckle ceiling should be expensive . The gypsum board ceiling looks relatively flat from the visual, but once there is a problem with the top surface water pipe, or if the leakage above the floor requires downstairs maintenance, etc., the gypsum board ceiling needs to be removed as a whole, which is much more costly than the buckle board ceiling. Therefore, we need to be cautious when choosing plasterboard ceilings. ¬
(9) Door installation ¬ On the second day of cabinet installation, as soon as the door measurement was completed more than one month ago, it is now possible to install it. If it goes well, it is also the time of the day. The hinges, door locks, and suctions to be installed at the same time when the door is installed. Students should prepare relevant hardware in advance. ¬
If you want the wooden door manufacturers to install window covers and gargles, they should be measured together when the wooden door manufacturers measure them, and they should be installed on the same day that the wooden door is installed. At the same time, the installation time of the marble window sill should be considered wrong. After installation. ¬
Remarks: The production period of wooden doors is generally one month. Therefore, in order to make the construction period close together, it is necessary to allow door manufacturers to measure the size of door openings as soon as possible after the completion of main body demolition. With regard to the handling of door openings, we need to pay attention to the fact that if the height of the door openings is inconsistent, the workers need to be treated as if they are equal in height - good-looking. ¬
(x) floor installation ¬
The floor can be installed on the second day of the wooden door installation. If it goes well, it is also a day. Floor installation requires attention to the following issues: ¬1. Before installing the floor, it is advisable for the manufacturer to survey whether the floor needs leveling or local leveling. Some decoration companies or renovating teams will advise students to level the floor or level the floor to the floor. The actual survey shall prevail; ¬
2. Before the floor is installed, the floor of the home's paving floor should be cleaned and the ground must be kept dry. Therefore, do not use water during the cleaning process. ¬
3, floor installation, if conditions, the floor must be cut in the corridor. In the past, the forum also discussed this issue. Some students think that it is immoral to cut floors in the corridors to pollute public areas. My idea is to clean it after it's finished. It doesn't matter. In the indoor cutting of the floor of the wall of the pollution is more serious, similar to the cutting of artificial stone countertops cabinets, I believe that the number of students who have been renovated have experience. ¬
(11) Paving Wallpapers ¬
On the second day after the floor is installed, the home is cleaned up and the wallpaper can be pasted. If it goes well, it will be the same day. If conditions permit, on the day of paving the wallpaper, the floor should be protected; if it is not conditional, it is okay to clean the leftover wallpaper glue on the floor to the original cleaning. Before paving the wallpaper, try to "don't have anything" on the wall. ¬
(12) Radiator installation ¬
On the second day after the wallpaper was laid out, students who replaced the radiators or dismantled the radiators could literally mount the radiator on the wall. The same is the time of day. ¬
Wooden door - floor - wallpaper - heat sink, this is a generally recognized correct installation order, first install the wooden door is to ensure that the baseboard of the floor can be closely integrated with the door of the wooden door cover; after loading the wallpaper is mainly because of the floor The installation is more dirty, more dust, and serious wallpaper pollution. Here again I used the principle of "who is dirty? The final radiator is installed because only the wallpaper on the wall can be installed to install the radiator. ¬
The gradual progress of the renovation process is designed under conditions of various constraints and constraints. Occasionally there are exceptions, such as Holtzmen need to install the floor after the door, but such exceptions are rare in the renovation process. ¬
In addition, I have repeatedly said "One day's time". There is a layer of meaning to remind the students that "one day" is not a long time for the entire renovation. Therefore, even if there is no installation conflict, such as cabinets and wooden doors, the students try not to Book two installations at the same time during the day, especially for the "big things" mentioned above, because the installation is very critical for these "big things". It is better to focus on one site instead of one. ". Learn to comfort yourself - that day is not bad. ¬
(thirteen) switch socket installation ¬
There is only one reminder of death: students should have a detailed understanding or record of the number of switches and outlets in the home, and the location, especially for wallpapering classmates. Sometimes wallpaper wallpaperers are not responsible. Wallpapers are hula. The child goes up and he doesn't use a wallpaper knife to mark the hole in your switch socket. Therefore, the students still need their own minds. ¬
(14) Fixing the lamp and installing the lamp, nothing to say. After the lights were installed, the home was bright and bid farewell to the dazzling glare of the 100-watt incandescent bulbs during the renovation - it felt good. ¬ (15) Hardware ware installation ¬
Before buying good plumbing, Bathroom Accessories, toilets, drying racks, etc., they are all installed. After those “big things†were installed, the family was still “coldâ€. After the fixtures and hardware were installed, the family “lived†and really “livedâ€. It is not an exaggeration to say that the first time you opened the dragon water and watched the flow of water “squeaking and squeaking,†your heart would be beautiful; for the first time at home, a newly installed toilet would be very fulfilling, right. I also gave it a good name - "Virgo." ¬
(16) Installation of curtain rods The installation of curtain rods marks the end of home improvement. ¬
(17) Pioneering cleaning
Before the pioneering cleaning, do not install curtains. I reminded you in the post on “Interpreting the Curtainsâ€. When pioneering cleaning, homes should not have furniture and unnecessary appliances. Try to keep more "flatness" so that the pioneering cleaning can be thoroughly cleaned. ¬
(18) Furniture approach ¬
With regard to the purchase time of furniture, my suggestion is that after the completion of the transformation of the water circuit at the earliest, the basic size range of the furniture we choose is only a few. Therefore, some students have already rushed to set the furniture before the decoration has begun. Personal feeling is not necessary. ¬ (19) Appliances approach
At this time, the entrance of the appliance to enter the field, the installation of the installation, ready to stay! ¬
(20) Home Accessories ¬
Home accessories, the final step of home improvement, and has been transformed from decoration to decoration, including the installation of curtains are part of home accessories. As for the purchase of curtains, it is best to order furniture to avoid style conflicts. Home accessories also include considerations such as buying some green plants, wall paintings, handicrafts, etc.... In short, after your stay, you are free to play. ¬
¬ Second, the two divisions of the decoration process ¬
1 Start formalities - 2 self-measurement - 3 pre-design - 4 main body dismantling - 5 door manufacturers to measure - 6 cabinets for the first time - 7 hydropower reform - 8 bathroom waterproof - 9 main material Approach - 10 carpentry - 11 tiling (installation windowsill, floor drain) - 12 installation of hood - 13 cabinets for the second measurement - 14 brush wall paint - 15 kitchen ceiling - 16 gas - — 17 Cabinet Installation (Simultaneous Installation of Sink and Gas Cooker) — 18 Door Installation — 19 Floor Installation — 20 Paving Wallpaper — 21 Radiator Installation — 22 Switch and Socket Installation — 23 Lamp Installation — 24 Hardware Sanitary Ware Installation - 25 curtain rod installation - 26 pioneering cleaning - 27 furniture approach - 28 appliance installation - 29 home accessories - 30 moving ¬
(a) The four steps of the renovation process
Broadly speaking, according to the 20 links mentioned at the beginning of the article, the whole process of decoration can be roughly divided into the following four links:
1, design links; (1) ¬
2, construction links; (2-6) ¬
3, installation process; (7-16) ¬
4, finishing links. (17-20) ¬
(B) The six steps of the entire renovation process
According to the characteristics of the project, according to the 30 links just mentioned, the entire process of decoration can be divided into the following six steps:
The first step: design ideas; (3) ¬
Step 2: Subject demolition; (4) ¬
Step 3: Covert Projects; (7) ¬
Step 4: Covering the project; (10, 11, 14, 15, 19, 20) ¬
Step 5: Installation phase; (17, 18, 21, 22, 23, 24, 25) ¬
The sixth step: the closing stage. (26,27,28,29,30) ¬
Specific instructions:
1. In order to distinguish from bees, we must first have design ideas;
2. The demolition of the main body is to completely transform the rough house into a construction site. The contents of the main demolition reform mentioned above have just said - "demolition of walls, walls, shovels, removal of heat, change steel windows, etc.", and some carpentry; ¬
3, hidden projects, it is equivalent to "medical surgery." The concealment project must be done first, which is what everyone often says “renovation starts, and hydropower goes firstâ€; ¬4. Covering a project is like giving home “wearing clothesâ€. Carpenter's window covers, cornices, bricklayers, brickwork, installation of window sills, oil painters - wood, tile, oil are three basic projects, behind the pinboard ceiling, paving the floor, after the wallpaper is over Even if the clothes are worn out; ¬
5, the installation phase, mainly to complete the functional realization. Including: cabinets, wooden doors, radiators, switch sockets, lighting fixtures, hardware, sanitary ware, curtain rods... Each item has its established function; ¬
6. In the closing stage, to put it plainly, it is to add the factors that do not constitute “can moveâ€. ¬
Through the analysis of the second section, “Two Categories of Renovation Processâ€, we can look back at the first section “Analysis of 20 links in the whole process of renovation†and the students may be able to understand it more easily. ¬
Things to know about renovation
1. If the home has a high frequency of cooking, try to give up the open kitchen, there will be fumes
2. Bathroom, kitchen water treasure, hot water faster, more convenient when used
3. The suction hood is more powerful than the European suction, and the European style is not good.
4. The power outlet can be installed as much as possible, otherwise the home is full of tow line
5. The toilet must be reserved on the edge of the toilet, otherwise Washlet cannot install
6. Bathtub PK shower, if you choose one of the two, it is recommended that the shower, bathtub installed, and never had no bath. The shower does not refer to the shower room. The glass in the shower room is still very tired. You can also choose to hang the shower curtain.
7. If there are 2 bathrooms, it is still necessary to install a bathtub, large bubble clothes, bathing the baby is a good choice, the jacuzzi will not be, not a few bubbles, but also particularly expensive
8. If it is not people who do not cook, the kitchen is best equipped with air conditioning
9. If you like to go online, at least 2 network ports and 2 or more outlets are reserved on each wall of each room. Wireless routing can indeed solve the problem, but it is said that it is sometimes unstable
10. Regrets that the kitchen flues haven't been punched out. Now as long as someone in the building is cooking, their own hood must be turned on at the same time, otherwise the smell of smoke in the room is full.
11. The location of various outlets in the room deviates from the dimensions of the furniture that will be bought later, wasting a lot of outlets
12. If you can buy in the mall, do not call woodworking! ! ! ! ! Unless this carpentry craft is quite good
13. The floor color is slightly lighter, and it is not easy to see the gray. The kitchen floor tiles are slightly darker. It is not easy to find the hair everywhere.
14. The restaurant is best equipped with a ceiling fan, super comfortable
15. As much storage space as possible, more and more debris will need to be stored after check-in
16. The balcony wall is best to use tiles, more waterproof than paint
17. I regret that I bought so many lights. In fact, there are several fixed ones. . .
18. The toilet's grooming table is glass, super easy to soil
19. In fact, group purchase can not afford to save a few money, not to buy the fine to buy, to believe that this will not be a reason for the sky out of the stuffing. The decoration of a house is a unit of 10,000 yuan, or more to the market to see, shop around forever. Don't be so hot at the group buying conference that the so-called "bargaining division" blows the spotlight on the spot. Even Liangjujue does not dare to say that its own products are absolutely cheap, not to mention the other so-called group purchase network?
20. Forget to turn the switch on the bedside and turn off the lights every time. It's very sad in winter.
21. Bathroom hardware, faucet and the like are absolutely a price for a goods
22. Try not to leave the area where you can't rub the decoration.
23. The family who intends to have children in the future must be considered to be in a good size. Aside from the bed, you must reserve a place where you can put your baby's cot.
24. It is recommended that all the faucets are equipped with hot and cold water pipes. It is not possible to spend a lot of money when decorating, and it is necessary to remedy super difficulties afterwards.
25. The less practical layout of the room, the better the RMB will not be torn off sooner or later out of date!
26. Pay attention to the size of the door in your home when you buy anything. Don't buy it and can't move in.
27. Solid wood floor feels good but needs maintenance, composite floor is easy to clean
28. The invisible door is impractical, and it is troublesome if you want to open it.
29. It's good to walk into a closet, but it's easy to get rid of dust. Open shelves, shelves, etc. (there's no door), it looks good, but it's painful, especially the book, a layer of gray. A
30. The light must not be washed up. After that hangs up, wait for it to accumulate.
31, installation of leakage protection device and air switch junction box project can not be saved, and not on the outside to be placed indoors, the original want to save the money will be on the outside of the junction box used, electrician recommended indoor exchange The new one now finds his suggestion very valuable.
32, leakage protection and air switch must use brand name.
33. The under counter basin is more beautiful than the above-mentioned basin. It looks good and is good for cleaning. With the basin mixer under the table should pay attention to, taking into account the thickness of the basin, the leading mouth to be longer.
34, the top corner of the wall without any modification is also very beautiful, but in advance to find the painter's stage and the painter clearly put forward. The top corner line helps to straighten the top corner line.
35. The surface treatment of the putty on the cement surface of the inline trough is very important. It is appropriate to use a clean ball for the unsturdy surface.
36, plaster is suitable for filling the larger hole in the wall, of course, if the hole is too large or need to use cement.
37. The back of the frosted glass must be protected from paint. It is difficult to clean!
38. The cooking Basin Faucet must be able to be switched on and off with the back of the hand. The kind of finger that must be used is not easy to keep clean, and it is difficult to turn it when there is oil on the hand.
39. The price of luxury automatic drying racks is too high. After comparison, some unfamous brands were found to be superior to the first-line brands in structure design, but the prices were much lower.
40, can consider using a metal socket installed in the ground, this socket is more than 100 expensive, but very convenient, usually flush with the ground, the foot can be a step on the pop-up socket. Suitable for large living room. Or put it under the dining table in the dining room to insert the hot pot (to prevent the wires from moving around when moving back and forth)
41, storage room. Already TX has said, but I did not make the door, looks not very beautiful, the cabinet that puts clothes again is easy to be dirty.
42, the bed starter (is it so called?). I bought a fabric bed for a professional bed company, and spent 350 yuan for such a thing. There is a handle at the end of the bed and the bed board will turn up to reveal the storage space underneath. It's great!
43, not practical double towel rack! At present, like the single pole use, basically no more towels will be put on the in-floor hanging bar.
44, feel that the garbage can inside the cabinet is not practical enough, it is better to put outside. Do not install door-type trash cans and countertop trash cans, and opening the doors in the summer can be stinky. It is better to put the trash can outside.
45. It is very convenient for the small cabinets at the table to be placed on the east.
46. ​​As far as I am concerned, mop buckets are not very demanding in terms of performance. They can build one out of their own. Tiles or mosaics that match the surrounding environment are beautiful and save money.
47, the bathroom can be nailed hook or clothes hook used to hang things.
48, the bathroom designed a small cup of clothing, no longer have to worry about taking a shower to get clean clothes.
49, washing machine drying is not practical, except for the only yellow day in the year, but also huge. Thick clothes and bath towels are still not dry enough for the sun to disinfect. Even if it is overdrawn, you need to save some money.
50. I even made a laundry pool in the laundry room for hand washing. Originally thought less, so I bought a very cheap faucet. Unexpectedly, this laundry pool was so convenient that it became the washing area with the highest frequency in my home. What rags, socks, and towels are all washed inside, and most of the washing hands are there.
51. It is really impractical to install light strips. The decoration has not been opened until now. When a guest comes in, it's just a spotlight on SHOW. I have forgotten to install this thing. Originally, it was romantic when she wanted to open PARTY. Now there are not many opportunities to open the lights.
52, the biggest experience is that in fact the decoration is as simple as possible, less pollution, less money, worry.
53. Practical stuff:
A well-designed storage room.
2 The sink for the washing of the north balcony. Distinguishes the washbasin from the bathroom and the kitchen's dishwashing and dishwashing bucket.
3 Toilets can be pulled out of the faucet. (The exception is TX, which is never washed in the basin).
4 Easy to clean floor and suitable cleaning tools.
5 kitchen countertop work lights.
54, buy a toilet must measure its own hole distance, or buy it and return it is really ... ...
55. After the kitchen tile is properly affixed, it is best to measure the level before it is dry. See if the lowest point is a floor drain, and wait until it finishes and then wrap it with the decoration team and die a lot of cells.
56, the shower room must be large enough size, but also use transparent glass, so that the shower will not appear cramped inside.
57, tile joints should not use white cement hook. Without a month it becomes black and it is ugly. As a result, he bought his own grout and hooked himself.
58. There should be a backboard under the artificial stone of the cabinet. After the installation, it was found to be no. Now I did not dare to cut the meat. I promised to recondition it for almost two months. I hadn't installed it yet. .
59, do not believe the designer's confusion. Of course, you can visit several decoration companies and extract the real useful things from each design. The key is how you want to dress your home.
60. If the original manufacturer or developer has already installed the deodorant "bowl", don't take it out.
61. After the bathroom floor tiles are properly attached, test the water and if the water flow is relatively slow, rework it immediately. The family's water flow was relatively slow. At that time, my heart was a little soft. Now when I take a bath, I always have a little water, and the shower heads of our main guards are idle. Now I am wondering how to remedy them.
62. When installing the hand basin, consider the relative position of the mirror, the brushing cup rack, and the towel rack.
63, consider the position of the mirror headlight when buying a mirror, if you do not want to install mirror headlights, the size of the mirror should be able to cover the line reserved for the mirror headlights best.
64, put a small cupboard on the balcony of the washing machine, convenient to put some debris, such as debris inside the washing powder. Both beautiful and practical
65. Be sure to stare upstairs for waterproofing.... or else drop water upstairs, get a wall cabinet, and the wall is messy....
66, do not blindly follow the online buy, I later found that some of their own to bargain will be cheaper than group purchase. Personally recommended bright home network (living in decojoy), the above things are indeed cheap, but the premise to fight.
67. A certain number of sockets, televisions, DVDs, etc., must be set on the TV background wall. You will find that the socket is not enough.
68. Before changing the waterway, consider what kind of washbasin you have in the future, such as the left or right basin, and where the water and drainage are located. Otherwise, only after the change did you find that the washbasin in the phase was not fit!
69. Regarding the curtains, it is best for everyone to leave a copy of the size and explain to the owner that the size cannot be reduced. If there is less, how is it? Or he looked at his cutting cloth.
70, decoration of the construction process:
(1) Enter the market, remove walls, and build walls. (2) The toilets and kitchen floors shall be closed for 24 hours (requires the developer to complete this task). (3) Chiseling trough, hydropower reform and acceptance. (4) Embedding of the concealed hydropower project in the trunking, and the water-sealing experiment began without leakage to start the waterproofing project. (5) Toilets, kitchen wall magnets. (6) Carpentry approach, hanging ceilings, plaster casts. (7) package door cover, window cover. Make wooden cabinet frame. (8) Simultaneous production of various wooden doors, modeled doors and flat pressure. (9) Wooden panel brush dustproof paint (clean oil). (10) The windowsill marble countertops are levelled and laid. (11) Wood veneer paste, line production and fine installation. (12) Wall base treatment, sanding, levelling (13), and adhesives (protection edges) are glued at the door seams. (14) Wall oil ICI at least three times. (15) Furniture paint enters the field, repairs nails, and paints. (16) Treat corners, laying floor tiles, solid wood or composite wood floors, waterproof marble strips, baseboards. (17) Fixtures, fixtures, handles, door lock installation and adjustment. (18) Clean up the hygiene, fill the floor tiles and remove the floor. (19) Initial inspection of interior decoration company. (20) Formal acceptance of the three party appointments is delivered to the owner.
71. Before the flue valve is installed, it must be cleaned to ensure that the valve can be switched freely and can be opened to the maximum, otherwise it will affect the smoke exhaust effect. Can be installed in the ceiling when the two do not install, such as the hood installed and tested correctly after the ceiling installed.
72. In such a large space of the living room and the dining room, the ceiling can't be done without doing it.
73, when you want to take a good air conditioning line, the power supply as close to the air conditioning as possible, so as not to see a power cord when installed air conditioning, leaving a trace of regret.
74. Personally measure and record the various dimensions available in the house. You can cover the size of the floor plan and then re-lead. The final size will directly affect the decoration design and furniture purchase.
75. The line is not good for small apartment If you choose black walnut is always not enough atmosphere, then you need to choose, or move to the actual or perseverance of their own ideas, of course, the best of both
76, began looking for decoration staff. As far as personal experience is concerned, if it is not particularly large and it is intended to be simply renovated, it seems that it is more cost-effective to find guerrillas. It is best to introduce after someone else has installed it. You yourself have also seen it and recognized it. It is particularly important for the person in charge of the decoration. The sense of responsibility and appreciation is more important. The former is more crucial because if it is only a paperback, it is actually alive. Almost all the outside will be mixed, but the quality is good or bad depending on the sense of responsibility.
77, the main furniture such as sofas, wardrobes, dinettes, cabinets, etc. are best to see more in advance, if you run around too tired, you can find a few shopping environment, a good large home square stroll, the basic trend to see It's coming out, so what you have to do next is to filter out the right things based on your own style. Some people have a better grasp of styles, and some people have a good grasp of color. It does not matter. There are still time to consider. If you wait until the decoration clearance site, the virtual steps to see the furniture will inevitably be reluctant to accept the final will not be very like.
78. It is best to write down the size of the furniture that has been considered good, and then to the virtual future of the room.
79. The necessary documents must be kept when purchasing things. This is absolutely beneficial to the situation of refunds and exchanges that may exist in the later period. In particular, some important items such as shopping tickets and manuals, etc., because many things have a warranty period, the loss of certificates would be more troublesome.
80, Mattress is too soft More decoration knowledge, please visit:
Xi'an Decoration Class Main Station: http://
Xi'an Decoration Classroom Video Station: http://
Xi'an Decoration Classroom Interactive Community: http://029zx.topzj.com
Entrance decoration study decoration window wallpaper wooden door paint socket living room wall color plasterboard ceiling price open kitchen decoration find decoration company good decoration living room home decoration TV background wall home decoration wall decoration style marble table cloth sofa cushion home cabinet plate furniture fabric sofa Bathroom Doors Baby Beds Floor Tiles Glass Tables Glass Tables Home Crafts Kitchens Glass Sliding Doors Home Wallpapers Function Sofa Beds Sofas Sofas Cabinets Doors Marble Cabinets Wall-mounted TVs Glass Doors Functional Sofas Glass Tiles Cabinet Doors Marble Tiles Mirrors Front Lights Glass Cabinets Craft Glass Cloth Beds Glass Furniture TV Wallpapers Ceiling Fan Lights Walk-In Wardrobe Kitchen Ceiling Open Closet Glass Door
Single handle basin faucet is easy for our normal life. You can control water with one hand easily.
Different style , different materials and different finish can satisfied with all your requirement. Pls feel free to contact us for further information.