Renovation construction process steps decoration construction process introduction

Renovating the house has become a top priority for many families. Before we renovate the house, we need to know the whole process of decorating the house and the precautions for the decoration. It is a troublesome thing for friends who do not have house experience. I know how to decorate the house, and what needs to be done in the decoration construction process . Today, Xiaobian will take a look at the steps and precautions of the house decoration.


装修施工流程


First, the house inspection


1. Waterway: Is the water inlet pipe open? Is the waterproof effect of the sewer pipe and the waterproof layer good?


2. Circuit: Strong wire (220V) does not enter the household, is the household line more than 6 square millimeters? Is the weak wire (TV telephone network, etc.) not in the household?


3. Civil construction: Is the wall surface level? Is there any crack? The soil cement powder (the surface of the earth and earth wall) is not high enough.


4, doors and windows: Is it installed according to the requirements of the purchase contract, how secure is the installation?


5, indoor area measurement: detailed measurement of the use area (required for decoration design), is the area consistent with the purchase contract? If there is no problem with the above Dongdong, you can really press the room, oh, maybe some small questions

Question, as long as you think about it, you can ask the staff of the property management staff. Oh, you can move on to the next step!


Second, the house renovation construction process:


1Preliminary design--2 main body demolition--3 hydropower transformation--4 woodworking--5 tiling--6 brush wall finish--7 kitchen and bathroom ceiling--8 cabinet installation--9 wooden door installation--10 floor Installation--11 paving wallpaper--12 radiator installation--13 switch socket installation--14 lamp installation--15 hardware ware installation--16 curtain rod installation--17 pioneer cleaning--18 furniture entry--19 Home appliance installation - 20 home completion, roughly in accordance with these 20 steps.


(1) Pre-design

In the early design, one of the things that friends must do is to make a detailed measurement of their room. Don't be lazy. It is best to measure it yourself. The main contents of the measurement include:


1. Identify the area involved in the renovation process. Especially the tile area, wall paint area, wallpaper area, floor area;


2. Identify the main wall dimensions. In particular, it is necessary to design the wall size of the furniture in the future.


(2) The main body demolition and improvement into the construction stage, the main body demolition is the first project, mainly including demolition, wall building, shovel wall skin, demolition of heating, plastic steel window and so on. The main body of the demolition is white, that is, the framework of the construction site is first put together.


( 3) Hydropower transformation

Before the water circuit was rebuilt, the main structure demolition should be basically completed. In the two aspects of hydropower transformation and main body demolition and rectification, some suggestions are put forward on the location of the water outlet and the hood socket reserved by the developer. mainly include:


1. See if the position of the hood socket affects the installation of the hood later;


2. See if the position of the water meter is appropriate;


3. Check if the position of the water inlet is convenient for installing the sink later.


For the first measurement of the cabinet, a slightly experienced friend can do it himself. After the completion of the waterway renovation, it is best to do the waterproofing of the bathroom. The kitchen generally does not need to be waterproof.


(4) Woodworking

Woodworking, bricklayers, and oilers are the "three brothers" in the construction process. The basic order of appearance is: wood - tile - oil. The basic principle of appearance is - who is dirty and who is first. "Whoever gets dirty first" is also one of the basic principles that determine the order of home improvement.


(5) tiling

In the process of “Washer Buddy”, the following three links are also involved:


1. Installation of door stone and marble window sill. The installation of the stone can be done with the paving slabs. After the paving slabs, the installation of the marble sills is usually done after the window sills are completed.

Glass glue, the marble and window cover are sealed with glass glue.


2. Installation of floor drains. The floor drain is the first in the home improvement hardware because it is to be installed together with the floor tiles. Therefore, when friends start building materials, they should buy floor drains early.


3. Installation of the hood. The range hood is the first to appear in the home appliance. After the kitchen wall and floor tiles are laid, you can consider installing the range hood.


"Wattenger second child" leaves the market. At this time, the cabinet can be measured for the second time. To be precise, after the kitchen wall tiles are installed and the hood is installed, the cabinet can be measured for the second time.


(6) Brush wall paint

The "oiler's third child" entered the market, mainly finishing the wall surface treatment, brushing the topcoat, and painting the furniture for the "carpentry boss". Friends who are ready to paste wallpapers only need to let the "oiler's third child" do the grassroots treatment on the wall of the wallpaper.


(7) kitchen and bathroom ceiling

The cabinet ceiling is the first step in the installation process, and it is still continuing the “packaging” of the home. At the same time as the kitchen and bathroom ceiling, the kitchen's moisture-proof ceiling lamps and exhaust fans (Yuba) should have been bought. Friends are best to put the kitchen ceiling lights, row

The fan (bath) is installed at the same time, or leave the thread and the opening.


(8) Kitchen cabinet installation

After the ceiling is over, you can install it on the door of the cabinet. If you are successful, you can finish the day. At the same time, there are also sinks (which may not include upper and lower water parts) and gas stoves. Before installing the cabinets, it is best to coordinate the property to pass the gas, because the gas stove needs to be tested after it is installed.


Many friends choose the waterproof gypsum board with waterproof paint for the ceiling of the kitchen and bathroom. The price of the decoration team is generally more than 120 yuan per square meter, which is more expensive than the general aluminum buckle plate and PVC gusset ceiling. The gypsum board ceiling looks visually flat, but if there is a problem with the top water pipe, or if the water leakage on the upper floor needs to be repaired downstairs, the gypsum board ceiling will be removed as a whole, which is much more complicated than the slab ceiling. Therefore, everyone should be cautious when choosing a gypsum board ceiling.


( 9) Wooden door installation

On the second day of the cabinet installation, as soon as the wooden door was measured more than a month ago, it was now ready for installation. If it is smooth, it is also the time of day, the hinge, the door lock and the ground suction to be installed at the same time. The relevant hardware should be prepared in advance.


If you want the wooden door manufacturer to install the window cover and the cornice, it should be measured together when the wooden door manufacturer measures it, and installed at the same time on the day of the wooden door installation. At the same time, the installation time of the marble window sill should be considered to be wrong, and arranged in the window cover. After installation. Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period close, it is necessary to let the wooden door manufacturers come to the door to measure the size of the door as soon as possible after the main body is demolished. Regarding the handling of the door opening, everyone needs to pay attention to it. If the height of the door opening in the house is inconsistent, the worker needs to be processed into a contour - good-looking.


装修施工流程


(10) Floor installation

The floor can be installed on the second day of the installation of the wooden door. If it is smooth, it is also a day. Floor installation needs to pay attention to the following issues:


1. Before installing the floor, it is best to let the factory go to the door to investigate whether the ground needs to be leveled or partially leveled. Some decoration companies or renovation teams will recommend that the students level the floor or level the leveling, which is subject to the actual survey of the floor manufacturer;


2. Before the floor is installed, the floor of the pavement floor of the home should be cleaned to ensure the dryness of the ground, so do not use water during the cleaning process.


3, when the floor is installed, if there are conditions, the cutting of the floor must be in the corridor.


(11) Spread wallpaper

On the second day of the floor installation, the house was cleaned up, and it was possible to spread the wallpaper. If it was smooth, it would be the same day. If there are conditions, the floor should be protected on the day of wallpapering;

Department, it is no problem to hand over the wallpaper glue left on the floor to the pioneering cleaning. Before laying the wallpaper, try to do "do not have anything" on the wall.


(12) Radiator installation

On the second day after the wallpaper was laid, friends who replaced the radiator or removed the radiator could hang the radiator on the wall. The same is the time of day. Wooden door - floor - wallpaper - radiator, this is a generally accepted correct installation sequence, the first to install the wooden door is to ensure that the baseboard of the floor can be closely engaged with the door of the wooden door; the back of the wallpaper is mainly because of the floor The installation is dirty, dusty, and the wallpaper is seriously polluted. Here again, the principle of "who is dirty first" is used. The final installation of the radiator is because only the wall wallpaper is laid to install the radiator.


(13) Switch socket installation


( 14) Lamp installation and installation of lights, nothing to say. After the lights were installed, the home was lit, and the farewell glare of the 100-watt incandescent bulb during the renovation was felt - it felt good.


(15) Hardware ware installation

The upper and lower water pipes, bathroom accessories, toilets, drying racks, etc., which were bought before, are all installed. After the "big pieces" were installed, the home was still very "cool". After the lamps and hardware wares were installed, the house was "live" and really "lived". It’s no exaggeration to say that the first time you open Longshui to watch the water “哗, 哗” go out, the heart will be beautiful; the first time at home, the newly installed toilet will be very fulfilling, give it a A good name - "Virgo."


(16) Curtain rod installation

The installation of the curtain rod marks the basic end of the home improvement


(17) Pioneer cleaning

Don't wear curtains before the pioneering cleaning, remember to remind everyone in the post of "Explanation of Curtains". When pioneering cleaning, do not have furniture and unnecessary household appliances at home, try to maintain more "flat", so that the pioneering cleaning can be thoroughly cleaned.


(18) Furniture entering the market

As for the purchase time of furniture, it is necessary to finish the water circuit transformation at the earliest. In this way, we can only choose the basic size range of furniture. Therefore, some friends have been eager to order furniture before the renovation has begun. Personal feeling is not necessary.


(19) Appliances entering the market

At this time, the home appliance should enter the market, the installation of the installation, ready to stay!


(20) Home accessories

Home accessories, the final step in home improvement, and has been converted from decoration to decoration, including the installation of curtains are part of the home accessories. As for buying curtains, it is best to order furniture to avoid style conflicts. Home accessories also include consideration for buying some green plants, wall paintings, furnishings, etc. In short, after you stay, you are free to play.


It is very troublesome to decorate the house. It must be carried out step by step. Every step can't be taken lightly. The above is the detailed introduction of the house decoration construction process introduced by Xiaobian today. It is over here. I hope to prepare for the renovation of the house. You said that help, want to know more information, please pay attention to the decoration home network.



More related wonderful reading:

Floor heating construction process electric heating floor heating construction process

Indoor construction process analysis indoor construction process considerations

How to do home improvement construction? What is the home improvement construction process?

How to operate wallpaper construction? Detailed wallpaper construction process

How to do the paint construction? Detailed paint construction process

The monitor display is a component of the CCTV system. It is the display part of the monitoring system and the standard output of the monitoring system. With the display of the monitor display, we can view the images sent from the front end. As an indispensable terminal device for video surveillance, it acts as the "eye" of the monitoring personnel and plays a key role in the subsequent investigation.

Lcd Monitor

304 Stainless Steel Material,Industry LCD Monitor,17 Inch LCD Industry Monitor

Shenzhen Wardmay Technology Co., Limited , https://www.wardmaycctv.com