Interior decoration construction process Daquan decoration notice

Most people think that the decoration is more troublesome and they are all handed over to the decoration company. Few homeowners will understand the interior decoration construction process . However, as a homeowner, learn more about the decoration of the construction process, chances are that in the future can also be a supervision work in the decoration of their own house. So, what are the general interior decoration construction processes ? Let's take a look with Xiaobian.

Interior decoration construction process

First, the previous design

Mainly designed according to their own living habits, and a detailed measurement of their own room, we should not be lazy, it is best to personally measure it again, the measurement includes:

Identify the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area;

Clear main wall dimensions. In particular, it is necessary to design the wall size of the furniture later.

Second, the main demolition reform

Into the construction phase, the main demolition reform is the first project on the first, mainly including the demolition of walls, walls, spade shovel, demolition heating, change steel windows and so on. When the main body is dismantled and reformed, it is to put the framework of the construction site first.

Third, hydropower reform

Before the transformation of the water circuit, the demolition of the main structure should be basically completed. Between the two stages of hydropower reform and main body demolition and reform, some students may know that the first measurement of cabinets should also be conducted. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not processed, the cabinet designer can not give a specific design size, but only for the developer reserved water inlet, hood socket Location, make some suggestions. mainly include:

Look at the position of the socket of the hood to influence the installation of the hood;

Look at the location of the water meter;

See if the location of the inlet is convenient for installing the sink later.

For the first measurement of the cabinet, slightly experienced students can do it completely. After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof.

Fourth, carpentry

Carpenters, bricklayers, and oil workers are the "three brothers" in the construction process. The basic order of appearance is: wood-tile-oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty, who is the first" is also one of the basic principles that determine the order of home improvement. Xiaobian will also mention it later.

In fact, carpentry activities such as installing standpipes, making decorative ceilings, and attaching plaster lines can be considered in a sense as a detailed link of the main demolition and reform. They themselves do not conflict with the transformation of water circuits, and sometimes they still need some. Cooperate.

Fifth, tiling

In the process of “bricklayer”, the following three steps are also involved:

Pass door stone, marble window sill installation. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now.

Floor drain installation. The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. Therefore, when the students started to visit the building materials, they should buy land drains as early as possible.

Hood installation. The hood is the first appearance of the appliance. After the kitchen tiles are laid, you can consider installing the hood.

“The bricklayer's second cousin” leaves the floor. At this time, the cabinet can be measured for the second time. Accurately speaking, after the wall tiles have been attached and the hood is installed, the second measurement of the cabinet can be performed.

Six, brush wall paint

The “oil worker's third child” entered the field and mainly completed the work of basic wall surface treatment, brush finish, and painting of furniture hit by the “wooden boss”. To prepare wallpapers for students, you only need to let the “oil worker” in the plan to do wallpaper on the wall. As for whether or not to leave the last time to finish the paint, personally feel that this problem is not necessarily too true, from the decoration experience of many people, the significance of leaving paint again is not great, because the latter operation is no more dirty than the paint .

Seven, kitchen ceiling

Cupboard ceiling as the installation of the first team, or in the continuation of the home "packaging." At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is best for students to install ceiling lights and exhaust fans (bath heaters) at the same time, or to leave heads and openings.

Eight, kitchen cabinet installation

After the ceiling is over, the cabinet door can be installed. If it goes well, one day can be completed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas.

Nine, wooden door installation

On the second day of cabinet installation, as soon as the wooden door measurement was completed more than one month ago, it is now possible to install it. If it goes well, it is also the time of the day. The hinges, door locks, and suctions to be installed at the same time when the door is installed. Students should prepare relevant hardware in advance.

If you want the wooden door manufacturers to install window covers and gargles, they should be measured together when the wooden door manufacturers measure them, and they should be installed on the same day that the wooden door is installed. At the same time, the installation time of the marble window sill should be considered wrong. After installation.

Remarks: The production period of wooden doors is generally one month. Therefore, in order to make the construction period close together, it is necessary to allow door manufacturers to measure the size of door openings as soon as possible after the completion of main body demolition. With regard to the handling of door openings, we need to pay attention to the fact that if the height of the door openings is inconsistent, the workers need to be treated as if they are equal in height - good-looking.

Tenth, floor installation

The floor can be installed on the second day of the wooden door installation. If it goes well, it is also a day. Floor installation needs to pay attention to the following issues:

1, before the floor installation, it is best to allow manufacturers to come and survey whether the ground needs leveling or local leveling, some decoration companies or renovation teams will recommend students leveling or local leveling, to the actual survey of the floor manufacturers prevail;

2. Before the floor is installed, the floor of the home's paving floor should be cleaned and the ground must be kept dry. Therefore, do not use water during the cleaning process.

3, floor installation, if conditions, the floor must be cut in the corridor. In the past, the forum also discussed this issue. Some students think that it is immoral to cut floors in the corridors to pollute public areas. In fact, cleaning after completion does not matter. In the indoor cutting of the floor of the wall of the pollution is more serious, similar to the cutting of artificial stone countertops cabinets, Xiao Bian believe that the number of students have been renovated experience.

Eleven, paving wallpaper

On the second day after the floor is installed, the home is cleaned up and the wallpaper can be pasted. If it goes well, it will be the same day. If conditions permit, on the day of paving the wallpaper, the floor should be protected; if it is not conditional, it is okay to clean the leftover wallpaper glue on the floor to the original cleaning. Before paving the wallpaper, try to "don't have anything" on the wall.

Twelve, radiator installation

On the second day after the wallpaper was laid out, students who replaced the radiators or dismantled the radiators could literally mount the radiator on the wall. The same is the time of day.

Wooden door - floor - wallpaper - heat sink, this is a generally recognized correct installation order, first install the wooden door is to ensure that the baseboard of the floor can be closely integrated with the door of the wooden door cover; after loading the wallpaper is mainly because of the floor The installation is more dirty, more dust, and serious wallpaper pollution. Again, the principle of "who is the one who is dirty first" is used here again. The final radiator is installed because only the wallpaper on the wall can be installed to install the radiator.

Thirteen, switch socket installation

Students should have a detailed understanding or record of the number of switches and outlets in the house and their location. In particular, for wallpapering classmates, sometimes wallpaper workers are not responsible. Wallpaper wallpapers will not be used. The wallpaper knife marks the opening of your switch socket. Therefore, the students still need their own minds.

Fourteen, lighting installation

Loading lights, nothing to say. After the lights were installed, the home was bright and bid farewell to the dazzling glare of the 100-watt incandescent bulbs during the renovation - it felt good.

15. Hardware ware installation

Before buying good plumbing, bathroom accessories, toilets, drying racks, etc., they are all installed. After those “big things” were installed, the family was still “cold”. After the fixtures and hardware were installed, the family “lived” and really “lived”.

16, curtain rod installation

The installation of curtain rods marks the end of home improvement.

Seventeen, pioneering cleaning

Before the pioneering cleaning, do not install curtains. I reminded you in the post on “Interpreting the Curtains”. When pioneering cleaning, homes should not have furniture and unnecessary appliances. Try to keep more "flatness" so that the pioneering cleaning can be thoroughly cleaned.

Eighteenth, furniture approach

With regard to the purchase time of furniture, my suggestion is that after the completion of the transformation of the water circuit at the earliest, the basic size range of the furniture we choose is only a few. Therefore, some students have already rushed to set the furniture before the decoration has begun. Personal feeling is not necessary.

Nineteenth, home appliance approach

At this time, the entrance of the appliance to enter the field, the installation of the installation, ready to stay!

Twenty, home accessories

Home accessories, the final step of home improvement, and has been transformed from decoration to decoration, including the installation of curtains are part of home accessories. As for the purchase of curtains, it is best to order furniture to avoid style conflicts. Home accessories also include considerations such as buying some green plants, wall paintings, handicrafts, etc... In short, after staying, you are free to play.

Interior decoration needs to be avoided

First, rush to the horse

Some people were eager to stay after they had a new home. They rushed to find a decoration company and asked the other party to deliver the work in ten days and a half. As for the design of the room and the selection of decorative materials, these householders did not consider carefully. This may lead to unsatisfactory renovations, so do not be too hurried before renovating. You must set aside a period of time to consider the design of the room and the choice of decorative materials, and to use a period of time to select a qualified decoration company.

Second, no overall chest

Before the renovation, you should be aware of the style of decoration of the room, the decorative materials used, the choice of furniture, and the approximate location and budget of the decoration. Don't think about these things without thinking about it and relying on a moment's likes and dislikes. There is no overall consideration for the decoration of the room. This often leads to the inconsistency of furniture and decorative styles.

Third, the surface of "grease powder"

In terms of the current architectural pattern, not all the patterns are very reasonable, so avoid relying on the original layout of the room and only do “superficial articles” of the room, which can only bring more inconvenience to users. From an aesthetic point of view, rectangular rooms are not ideal.

Fourth, "one size fits all"

Although a house should be unified under a decorative style, each room has a different function and the occupants are different. Therefore, do not use a decorative style in all rooms, use the same decorative materials. Doing so can only make the room appear lacking in taste and change.

Fifth, regardless of primary and secondary

Some people do not divide the primary and secondary in the decoration, and treat all spaces equally. This renovation not only costs too much, but often “does twice as much”. In fact, the decoration of certain spaces in the whole room can be concise, with furniture and decorations to decorate the space.

The above information about the interior decoration construction process is introduced here briefly and I hope to help you. If your home is planning to renovate a new house, you may wish to take a closer look at the renovation process and have a good idea. In the future, you can better coordinate the overall situation. If you do not understand anything, please leave a message and we will answer your questions as soon as possible! For more information, please visit this website. Stay tuned.

Interior decoration construction knowledge