Flooring Considerations Floor Leveling is Key

Flooring considerations Ground leveling is key

Before the shop to do a good job on the ground to eliminate hidden dangers in the bud

Before laying the floor, we must first check the condition of the ground and thoroughly clean the ground surface. Any damage to the ground should be promptly repaired. We must ensure the smoothness of the construction site, especially where the cement is not trodden after embedding. If the floor is not clean and flat, floor tilting, unevenness, etc. will easily occur after laying. Before the installation, the direction of the paving shall be surveyed. The paving of the entire room shall be started from one side of the room and gradually approached to the other side.

Special attention should be paid to the fact that the first floor to be laid leaves room for the wall, and that the second floor next to it is to use plates, so that the ends of the two adjacent parallel floors are opened. As a reference for the seam between the floor and the wall, in addition, when connecting with the fixed facilities such as stairs and room lintels, the same gap should be left. The length is generally between 0.8 cm and 1.0 cm.

In addition, when laying floors, the first few rows of floor are generally used as the laying standards. Therefore, in order to ensure the overall laying effect, the laying of the first few rows of floors must be done, and the assembly model must be prepared in advance. If you use a hand saw to cut the floor, you need to face the floor pattern. If you use a power saw to cut the floor, the pattern of the floor faces downwards. And the end of the floor must be cut and neat. The length of the cut floor is generally not less than 20 cm and the width is not less than 5 cm.

When laying, apply glue evenly to the groove on the edge of the floor, and then install the other floor into the notch. Then use professional bricks against the outside and tap the bricks with a hoe to reduce the gap between the floor and the floor.

Experts advise you to pay special attention to the use of the floor to measure the size and carefully cut the floor.

Pavement finished baseboard polymer baseboard suitable for uneven ground

After the floor is finished, the baseboard is next. On the floor closest to the wall under the wall, use a percussive drill to drill a row of holes and knock in wooden pegs, then attach the skirting board and secure it with a nail.

Here we must pay attention to, before work, we must mark the position of the hole. At present, the more common baseboard is divided into two kinds of density board and polymer. The baseboard of the MDF is more afraid of water and can not be blisters. At present, the more popular polymer baseboard, compared with the traditional MDF baseboard, has a variety of colors, good elasticity, good water resistance and other characteristics, especially with the floor is not very flat floor, with polymer kicker The line is very nice. If the environment of the house is not particularly humid and the surface of the wall is very flat, the effect of using a MDF baseboard is also very good.

In addition, after the floor is fully installed, the floor must be allowed to stand for a period of time. Do not use your feet to step on the floor. Allow the glue to dry naturally. This way, you can ventilate the air. It is best to let it dry for 24 hours. Conditions can be allowed to air for longer.

Flooring Nature Flooring Room Stairs Housing Cement Flooring Tiles

Grey Color Self Adhesive Car Sheet Film

Grey Color Self Adhesive Car Sheet Film,Solar Car Tint Window Film,Car Smart Film For Windows,Car Switchable Smart Film

Shenzhen YuGuang New Material Co.,Ltd , https://www.ygsmartfilm.com