Ss400 Q235B SPHC HRC Black Carbon Steel Hot Rolled Steel Coil
Product Description
Â
 1.Description of Hot Rolled Steel Coil
Â
Product Name | prime HR hot rolled steel coil | ||
Standard | AISI, ASTM, BS, DIN, GB, JIS | ||
Special Use | High-strength Steel Plate | ||
Application | Transport, construction, shipbuilding, gas containers, etc | ||
Supplier | HBIS, AnSteel(Sochi Olympic Supplier), BaoSteel,etc | ||
Type | 2-25mm*600-1500mm | ||
Shape | Coil | ||
Certificate | SGS | ||
Delivery Time | Stocks within 3Â days, customized around 20 days. | ||
Packing | Export standard, plastic film+water proof paper +Â steel plate+ packing steel strip. One coil per bundle, inner is the protecting humidity-proof wax paper. Medium is plastic film. Outer is all round steel packing. Coil to be laid on single pallet (one pile per pallet). |
Chemical Composition | |
Q235A |
C:0.14~0.22%; Mn:0.30~0.65; Si≤0.30; S≤0.050; P≤0.045 |
Q235B(Hot Selling) |
C:0.12~0.20%; Mn:0.30~0.670; Si≤0.30; S≤0.045; P≤0.045 |
Q235C |
C≤0.18%; Mn:0.35~0.80; Si≤0.30; S≤0.040; P≤0.040 |
Q235D |
C≤0.17%; Mn:0.35~0.80; Si≤0.35; S≤0.040; P≤0.035 |
 2.Image of Hot Rolled Steel Coil
Packaging &Â Shipping
Â
Packing: with bundles, seaworthy packing for sea transportation (Â big order in bulk; small order packed by strips or as the customers' requirement)
Delivery: 7-15days after receiving unfront payment
FAQ
 Q1: What is your terms of payment?
A: 30% T/T as the upfront deposit, 70% before delivery. We will show you the photos of products and package before you pay the balance.
Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU
Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7Â days after we received your deposit.
For production period, it usually takes about 15 days-30 days after receiving the deposit.
Q5: Could you produce according to the samples?
A :Â Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.
Q6: Could you provide the compliment samples?
A: yes, we could provide the free samples on conditons it is available in stocks, however, the the transportation fee is borne by buyer.
Q7: How could you guarantee your products?
A: Each piece of products is manufactured by certified workshops, inspected by Suorong, piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality.
Q8: How do we trust your company?
A: We specialise in steel business for years, headquarter locates in Jinan, Shandong province, you are welcome to investigate in any ways.
Â
Alan BaiÂ
Export ManagerÂ
Jinan Suorong Trade Co., Ltd.Â
Tel: 0086 0531 68826732
Cell :0086 18366104332
Â
Product Description
Â
 1.Description of Hot Rolled Steel Coil
Â
Product Name | prime HR hot rolled steel coil | ||
Standard | AISI, ASTM, BS, DIN, GB, JIS | ||
Special Use | High-strength Steel Plate | ||
Application | Transport, construction, shipbuilding, gas containers, etc | ||
Supplier | HBIS, AnSteel(Sochi Olympic Supplier), BaoSteel,etc | ||
Type | 2-25mm*600-1500mm | ||
Shape | Coil | ||
Certificate | SGS | ||
Delivery Time | Stocks within 3Â days, customized around 20 days. | ||
Packing | Export standard, plastic film+water proof paper +Â steel plate+ packing steel strip. One coil per bundle, inner is the protecting humidity-proof wax paper. Medium is plastic film. Outer is all round steel packing. Coil to be laid on single pallet (one pile per pallet). |
Chemical Composition | |
Q235A |
C:0.14~0.22%; Mn:0.30~0.65; Si≤0.30; S≤0.050; P≤0.045 |
Q235B(Hot Selling) |
C:0.12~0.20%; Mn:0.30~0.670; Si≤0.30; S≤0.045; P≤0.045 |
Q235C |
C≤0.18%; Mn:0.35~0.80; Si≤0.30; S≤0.040; P≤0.040 |
Q235D |
C≤0.17%; Mn:0.35~0.80; Si≤0.35; S≤0.040; P≤0.035 |
 2.Image of Hot Rolled Steel Coil
Packaging &Â Shipping
Â
Packing: with bundles, seaworthy packing for sea transportation (Â big order in bulk; small order packed by strips or as the customers' requirement)
Delivery: 7-15days after receiving unfront payment
FAQ
 Q1: What is your terms of payment?
A: 30% T/T as the upfront deposit, 70% before delivery. We will show you the photos of products and package before you pay the balance.
Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU
Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7Â days after we received your deposit.
For production period, it usually takes about 15 days-30 days after receiving the deposit.
Q5: Could you produce according to the samples?
A :Â Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.
Q6: Could you provide the compliment samples?
A: yes, we could provide the free samples on conditons it is available in stocks, however, the the transportation fee is borne by buyer.
Q7: How could you guarantee your products?
A: Each piece of products is manufactured by certified workshops, inspected by Suorong, piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality.
Q8: How do we trust your company?
A: We specialise in steel business for years, headquarter locates in Jinan, Shandong province, you are welcome to investigate in any ways.
Â
Alan BaiÂ
Export ManagerÂ
Jinan Suorong Trade Co., Ltd.Â
Tel: 0086 0531 68826732
Cell :0086 18366104332
Â
Emergency Led Drivers,Emergency Battery Backup Led Driver,Led Emergency Backup Driver,Emergency Light Drivers
Foshan Nai An Lighting Electric Co.,ltd , https://www.ledpowerpack.com