Solid wood floor quality combined paving method

According to statistics, the popular civil interior floors in the market mainly include four categories: solid wood flooring, engineered wood flooring, reinforced wood flooring, and bamboo flooring. Solid wood laminate flooring, laminate flooring and more use floating suspension method. More than 40% of the ground complaints are caused by improper paving. Gao Zhihua, executive deputy director of the Flooring Committee of the China Timber Distribution Association, said that the quality of the floor has not only been limited to the floor itself, but the floor covering has also become an important part of measuring the quality of flooring products.

Solid wood floors are mostly made of keel paving.

Suspension pavement

There should be a distance between the door and the ground. The specific installation method of the floating paving method is divided into four steps: First, on-site inspection; Second, the laying of the cushion; Third, the floor test shop; Fourth, the device. The on-site inspection is mainly to check the distance between the door cover and the door leaf. Guarantee device

If it is less than 5mm, the door leaf needs to be removed and there is a 5mm gap behind. Plane the lower edge of the door with a planer to ensure that the door is 5 mm apart from the floor to prevent friction between the door and the floor. The laying of the cushion should be perpendicular to the direction of the floor bar. Before the formal installation, the floor should be tested, that is, no gluing pavement. When test-assisted, the direction of the floor bar is usually the same as the length of the room.

According to the order of trial floorboards, they are assembled and formally installed. Then use a tensioner to check tightness. The last row of floors should be properly measured to measure its width, cut, sizing, and pulled tight with a hook. In the process of laying, if you encounter pipes, pillars, etc., holes should be properly cut, taking care to leave a certain gap. After sizing, the remaining glue that is squeezed into the floor gap should be removed in time and cleaned with a damp cloth. After the device is completed, it must not be allowed to walk on the floor for at least 12 hours in order to allow enough time for the floor glue to stick.

Keel paving method

Keel paving and surface paving are the two key links in the keel paving method. The keel paving method is a commonly used paving method for solid wood floors. Gao Zhihua introduced.