The installation of the floor is very stressful. Because the wooden floor has the characteristics of thermal expansion and contraction, there is no doubt that to achieve this "seamless" effect, the technology of the installation technician must be very exquisite. In fact, this is just a problem with the installation method. There are many ways to install the floor, roughly the following four:
First , suspension laying method :
This method is the former most popular and scientific method of laying.
Second, the keel laying method:
This method is relatively more traditional and relatively common.
Third, the floor laying method :
This method is to add a layer of about 12mm~22mm multilayer high-quality plywood or softwood on the keel before laying the floor.
Fourth, direct paste laying method:
This method is mainly applicable to 350mm long floor, and the ground must be level.
These four methods are used only when there are special needs. The most common one is the first one. Let's take a look at the steps of the first floor installation method.
1, measurement:
Measure the actual area of ​​the installation site and the floor area, estimate the approximate floor usage, and avoid unnecessary waste.
2, cleaning:
Clean and clean the floor to be installed. For uneven floors, fill with cement or dry powder to keep the floor dry.
3, draw line:
Draw a vertical line that is the vertical line between the floor and the wall. The distance between the reference line and the wall is about 10~12mm.
4, laying the floor:
The first row should be aligned with the drawn baseline, and the direction of the floor should be aligned with the direction of the room. The last row should be properly cut, sized, and tightened with a pull hook or screw top by measuring its width. Wooden floor has the property of thermal expansion and contraction, so you should leave enough expansion joints. In addition, the groove should be placed on the wall, between the floor and the wall. Check the side of the shop to adjust it at any time. After the inspection is completed, the sizing can be installed.
5, install the floor:
When installing the floor, it is necessary to pay attention to the interface of the room, hall, hall, etc., the floor needs to be cut off, leaving enough expansion joints to connect with the closing strip or metal bridge to avoid floor consumption and deformation and facilitate maintenance.
Other wonderful articles recommended:
Scholarly Doors Aesthetic Flooring Leading to Floor Aesthetics
Nature Flooring Price Nature Flooring
Top Ten Brands of Solid Wood Floorings in 2013
How is the Holy Image Floor?
Kang Hui floor how? Kang Hui floor is good