Cleanroom decoration purification plant design and construction

Dongguan is known as the “factory of the world” and there are a large number of companies that need cleanrooms such as electronics, medicine, food, and daily chemicals. Demand from the market was strong, resulting in Dongguan's decontamination engineering company also maintained a good level in the market competition, has been at the forefront of the industry. Dongguan Hejing Purification Engineering Co., Ltd. is an excellent enterprise specializing in the design and installation of dust-free workshops in electronics factories. We specialize in designing, building ten, hundred, thousand, 10,000, 100,000, and 300,000 grades. Dust-free purification of space, leaving a large number of classic cases in the market.
Clean room purification decoration construction requirements:
1. Self-leveling ground treatment for ground treatment, laying 2mm thick pvc flooring.
2. According to the requirements of the GMP standard, the clean room should be designed and installed to avoid the parts that are difficult to clean during use. When the project is undergoing decontamination and renovation, the doors and windows are installed in conjunction with the building, air conditioning, various pipelines, and lighting fixtures. The gap should be sealed.
3. All the fittings, partitions, ceilings and suspensions can only be connected to the main structure, and can not be mixed with the equipment and pipeline brackets to prevent loose decoration materials and dust from falling off due to microseismic.
4. The gap between architectural decoration and doors and windows should be sealed at the front.
5. According to the GMP certification inspection standards, the interior decoration shall meet the following requirements:
(1) Materials with good airtightness and small deformation under changes in temperature and humidity should be used.
(2) The surface of the wall and ceiling should be smooth, flat, non-ash, dust-free, corrosion-resistant, impact-resistant, easy to clean, and less concave and convex. Walls and ground junctions are made with rounded corners with a radius of 50 mm. The color of the wall should be harmonious, elegant and easy to identify pollutants.
(3) The doors, windows and interior walls should be straight and the structure should fully consider the sealing of air and water vapor so that the pollution particles are not easily penetrated from the outside to prevent condensation due to the temperature difference between the interior and exterior. The gap between the inner door, the inner window, and the partition between the different cleanliness rooms in the room must be sealed.
6. The amount of dust generated during construction operations should be controlled during construction, especially the concealed space such as ceilings and clip walls, and must be cleaned at any time.
7. In the room where high-efficiency filters have been installed, dusty decoration work cannot be performed.
8. Attention should be paid to the protection of the completed work surface, and no dents, splinters, and surface decoration contamination of the board shall be caused by impact, knocking, stamping, and multiple water operations.

Customized Handle

Customized Handle,Matte Gold Door Handle,Black Copper Wardrobe Handle,Electric Four-Wheel Door Handle

Zhaoqing Muyi Hardware Products Co., Ltd , https://www.muyihardware.com