100 square meters decoration and hydropower reform price hydropower reform how much budget is reasonable?
Hydroelectricity renovation refers to the renovation of all or part of the waterway and circuit used by the original developer according to the decoration configuration, family population, living habits, and aesthetic concepts. Hydroelectric reform is divided into waterway reconstruction and circuit reconstruction. So, what is the price of renovation and hydropower renovation for 100 square meters? Most of the homeowners who have completed the renovation will complain that hydropower reform is the most tricky part of the project. It is not easy to exceed the budget and do not say anything. The excess is not a little bit, and it may even be several times! Today, I took a 100-square-meter house as an example and told the owners that it was reasonable for the 100-square-meter decoration and hydropower reforms and how the hydropower reform would be budgeted.
Decoration of hydropower renovation price of house renovation steps
1, pre-design
In the early design process, the first thing we need to do is to make a detailed measurement of our own room. This will not only allow you to purchase building materials accurately, but also protect against hacking during settlement.
The main contents of the measurement include:
(1) Identify the area involved in the renovation process. Especially tiling area, wall paint area, wallpaper area, floor area.
(2) Clear the main wall dimensions. In particular, the size of the furniture wall to be placed in the future needs to be designed.
2, the main demolition reform
After entering the construction stage, the demolition of the main body is the first one to be put on the project. It mainly includes the demolition of walls, shoveling of wall coverings, demolition of heating equipment, and replacement of plastic steel windows. To put it plainly, it is to put the framework of the construction site first.
3, hydropower reform
Between the two stages of hydropower reform and main body demolition, some rookies may know that the first measurement of cabinets should also be conducted. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not processed, the cabinet designer can not give a specific design size, but only for the developer reserved water inlet, hood socket Location, make some suggestions. mainly include:
(1) See if the position of the hood of the hood affects the installation of the hood later.
(2) Look at the location of the water meter.
(3) Check if the position of the water inlet is convenient for installing the water tank later.
For the first measurement of the cabinet, the slightly experienced rookie can do it completely on its own. After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof.
Some people always think that before the renovation starts, some main ingredients should be in advance. Unless it is the main material needed for the main body to be demolished, the entry time of main materials such as tiles and large core boards should be after the hydropower reform. Because the circuit modification involves ground slotting, if tiles or large core boards are improperly positioned, it is troublesome for workers to move in and out.
4, woodworking
Carpenters, mason, and painters are the “three brothers†in the construction process. The basic order of appearance is: carpenters, mason (bricklayers), and painters. The basic appearance principle is who is dirty and who is on top.
5, tiling
If the workers are too busy, the foreman will normally allow the “mason second child†to enter the tiling when the “wooden boss†is not over yet. This is normal, because there is no conflict between the two.
The process of the “Mason 2nd†job also involves the following three stages of installation:
(1) Installation of door stone and marble window sill. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now.
(2) Installation of floor drain. The floor drain is the first one to appear in the home improvement hardware because he has to cooperate with the floor tile to install it. Therefore, when rookie people begin to visit the building materials market, they should buy land drains as early as possible.
(3) Installation of hoods. The hood is the first appearance of the appliance. After the kitchen tiles are laid, you can consider installing the hood.
"Mason's second cousin" leaves the floor. At this time, the cabinet can be measured for the second time accurately. After the kitchen wall tiles have been attached and the hood has been installed, the cabinet can be measured for the second time.
6, brush wall paint
The oil industry's youngest three "entered the market, mainly to complete the basic treatment of the wall, brushing the topcoat, and painting the furniture used by the "wooden boss". For the rookie to put on the wallpaper, it was only necessary for the "oilman" to be posted on the plan. The wall surface of the wallpaper can be processed as a base layer.
At this time, when the "boss", "second child" and "third child" have left the field one after another, many rookies will think that their decoration is over. In fact, if one counts according to the number of links, one-third will not be enough. The reason why everyone has this feeling is that people generally understand the decoration is only the decoration of the "construction part", in fact, the decoration of the "installation link" is also the focus of decoration.
7, kitchen and toilet ceiling
As the head of the installation of kitchen and bathroom ceiling, or continue to the home "packaging." At the same time as the kitchen ceiling, the cabinet's moisture-proof ceiling lamp and fan (Yuba) should have been bought. Rookies are better equipped with ceiling lights and exhaust fans (Yuba) at the same time, or set aside heads and openings.
8, cabinet installation
After the ceiling is over, the cabinet door can be installed. If it goes well, one day can be completed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas.
9, wooden door installation
On the second day of cabinet installation, the doors should have been measured as early as a month ago and can now be installed. If it goes well, it is also a day's time. The hinges, door locks, and suctions to be installed at the same time when installing the door should be prepared in advance.
(The production period of wooden doors is generally one month. Therefore, in order to make the construction period close together, it is necessary to measure the size of the door openings as soon as possible after the completion of the demolition of the main body. As for the handling of door openings, you need to be aware that if you open the door, The height is inconsistent and it takes the workers to deal with the heights.
10, floor installation
The floor can be installed on the second day of the wooden door installation. If it goes well, it is also a day. Floor installation needs to pay attention to the following issues:
(1) Before installing the floor, it is advisable for the manufacturer to investigate whether the ground needs leveling or local leveling.
(2) Before installing the floor, the floor of the home's paved floor should be cleaned, and the ground must be kept dry. Therefore, do not use water during the cleaning process.
11, paving wallpaper
On the second day after the floor is installed, the home is cleaned and the wallpaper can be pasted. If it goes well, it's the same time of day. If conditions permit, on the day of paving the wallpaper, the floor should be protected; if it is not conditional, it is okay to clean the leftover wallpaper glue on the floor to the original cleaning. Before paving the wallpaper, try to "don't have anything" on the wall.
12, switch socket installation
Sockets are connected to 3 lines, according to the left zero line right FireWire, ground wire inserted in the middle, the general socket has said that the fire line is L, the zero line is N, the ground line is a symbol. The switch is connected to the fire wire at one end and the electrical or electric light at the other end. This will be fine.
13, lighting installation
Loading lights, nothing to say. After the lights were installed, the home was bright, and bid farewell to the dazzling glare of the 100-watt incandescent bulbs during the renovation. It feels good.
14, hardware installation
Before buying good plumbing, bathroom accessories, toilets, drying racks, etc., they are all installed. After those "big things" were installed, the family was still "cold". After the lighting and hardware were installed, the family "lived" and really "lived". It is not an exaggeration to say that the first time you turn on the faucet and look at the flow of water and turbulence, your heart will be beautiful; for the first time in your newly installed toilet, you will feel a sense of accomplishment. By the way, you can give it a good name: "Virgo."
15, curtain rod installation
The installation of curtain rods marks the end of home improvement.
16, pioneering cleaning
Don't install curtains before cleaning up. When pioneering cleaning, homes should not have furniture and unnecessary appliances. Try to maintain more “flatness†so that the pioneering cleaning can be thoroughly cleaned.
17, furniture approach
The purchase time of furniture is also the earliest after the completion of the hydropower reform. We have only a few basic dimensions of furniture in our mind. Some rookies have already rushed to order their furniture before the renovations have yet to begin. This is not necessary.
18, appliance approach
At this time, the approach of home appliance entering the field, the installation of the installation, ready to stay.
19, home soft installation
Home accessories are the last step in home improvement, and there are already renovations to the decoration, including the installation of curtains are all part of the furniture accessories. As for the purchase of curtains, it is best to order furniture so as not to conflict with style.
Furniture accessories also include considerations such as buying some green plants, wall paintings, and handicrafts............ In short, after your stay, you are free to play. At this time, you have been promoted to a master of decoration by a rookie. Let us take a look at the following, how to calculate the cost of decoration and hydropower renovation.
The cost of renovation and hydropower renovation
Decoration materials costs account for the largest proportion of decoration expenditures and are the most important factor affecting the decoration cost. There are various types of decoration materials on the market, and the grades and quality vary greatly. What level of decoration materials are selected directly determines the cost of renovation.
1, labor costs. Every worker’s daily wages are multiplied by the number of people and the number of days, and the total number of labor costs can be calculated. This is an important part that we cannot ignore in the renovation and renovation of hydropower prices.
2, the design fee. Different designers have different design complexity and different design fees.
3, management fees. During the renovation process, the decoration company will need to pay for the vehicle, go out to help with the purchase of materials, approach the supervisor, and coordinate the costs for all aspects.
4, profits. Each decoration company is not God. It will surely charge a certain amount of profit. It depends on how much it is charged.
The difference between the decoration costs of the formal hydropower installation company and the “street guerrillas†for the decoration of the hydropower renovation price was taken as an example of a 100-square-meter house:
1, open wall slot interpolation. 100 square meters of the house, you need to open water, wire trough is about 65-85 meters, in accordance with the requirements of the code, water, electrical wiring must be in the wall. Currently, the calculation of the slotting labor cost for the mixed brick wall and concrete wall on the market can be regarded as reasonable at an average price of 10-15 yuan. The dressing involves the filling of cement, yellow sand, glue, etc. The tools now usually involve saw blades. Scrapers and so on, 10-15 yuan are reasonable. Some reinforced concrete walls are extremely difficult to slot, and saw blades and labor are very expensive. It is necessary to pay for them.
2, water pipes. After years of market testing, PPR pipes are now mostly used. The prices of water pipes and fittings basically have to account for 50% each, and some self-employed households put the price of water pipes at a low price. They seem to be brand-name products. But fittings are not imported from specialized water supply suppliers. deficit. Manufacturers or merchants calculate the labor cost according to the number of kitchens, toilets and balconies, ranging from RMB 150-300/set. If it takes a meal and a bath, it takes about 60-70 meters. Of course, the distance between the kitchen and the bathroom, and whether the balcony is drained, will affect the number of water pipes.
3, gas pipe. The pipe from the gas meter to the cooker and shower is generally within 12 meters. The safety of laying gas pipelines involves safety issues. It is suggested that the gas company can be responsible for the deployment. The costs incurred in this part mainly include pipes and elbows, etc. The labor will not exceed 10 yuan/m. This part of the material + artificial total price will not exceed 300 yuan.
4, switch socket. According to the amount of configuration required by the owner, about 55-65 units will be allocated for 100 square meters. This part of the labor costs 4 yuan / month, but also the occurrence of cassettes, octagonal boxes and hose and other costs, such as the quality of the film box in the 1.7 yuan a medium, labor costs not more than 1-3 yuan / month, but also need some electrical accessories Wait.
5, wire and tube. The PVC wire bushings (4 points and 6 points) of Zhejiang Zhongcai's wires are usually used. The number is related to the direction and quantity of the wires. Strong and weak power must be separated. The general requirement is within 200 meters.
6, strong and weak wires. A house of 100 square meters (building area), the number of normal strong electric wire within 1,000 meters, including 1.5 specifications, 1.5 square meters, 2.5 square millimeters, but the lamp layout will exceed the above number. The ratio of each specification line is approximately 3.5:5.5:1. Individuals can refer to the construction area of ​​10m/m2. Weak electricity includes televisions, telephones, network cables, etc., usually 100 square meters (building area) of the house, each type of wire usually requires 65-75 meters. The wire laying cost 1 yuan/m is reasonable. At the same time, there will be a little loss of dressing and tools.
7, the wall hole. Due to indoor needs such as wearing pipes, each household should make 5-20 holes in the wall. The market price is 15-25 yuan per month, but some residential properties are designated as cavemen and charge 85 yuan per month. Since the number of holes and the price cannot be determined before the start of construction, it is possible for the construction staff to help contact the drillers, which is more affordable.
Note: This price is for reference only! Due to geographical differences, of course, the price will be different. If you want to know more about the relevant price details, please use the local dealers to provide!
Editor's summary: The above is only the most basic decoration of the relevant content of the hydropower reform, the final home of hydropower reform need to spend much money, but also according to the actual situation. For more information, please continue to pay attention to our website, follow-up will show more exciting content.
100 square meters three home decoration 100 square meters interior decoration hydropower reform 106 flat three rooms 100 square meters decoration decoration hydropower reform price
AGLEX L700 led grow lights is our newest led plant Grow Light, with 6 bars, foldable and dimmable design. It can be customized with different LEDs like Samsung LM301B, LM301H, SMD 3030, or different brands of driver, like Meanwell, Sosen, or custom with controller. But we may suggest our standard one, we have taken an half and a year tests to find the best solutions with cost effective cost, finally with excellent results. Our standard l700 is ideal one.
We have been specialized in LED Grow Light for 4 years. If you insist wanna to design your own lights, we could help you realize it. AGLEX - Advanced Grow Light Expert.
AGLEX L700 Specifications:
- Model: AGL-700W-L01
- Actual Power: 700W ± 5%
- Amp: 6.5A @110V / 3.2A @220V
- Dimensions: 42.52*41.54*2.36 inches / 108*105.5*6cm
- Item Weight: 38.58 lbs / 16kg
- Chips: SMD 3030/ LM301B/ Souel +660nm 740nm
- LED Quantity: 1440pcs
- Perfect Coverage: about 6*6ft
- Full spectrum 380-780nm for all stages of plant growth (red, white, ir)
- UL IP65 Waterproof Driver
- Dimming 0-100%
- Foldable 90°
- Input Voltage: AC100-277V
- Frequency: 50-60Hz
- Lifespan: 500,000 hours
- Warranty: 3Years
Welcome to contact us for more details