Quick Tips for Wall Tiles Tips for Wall Tiles
I believe we should all understand that, to the wall tiling is a very good decoration, not only beautiful, but also very affordable decoration costs, can greatly meet the needs of many owners. However, everyone is not familiar with the technique of wall tiling. The following Xiaobian introduced to everyone the skills of quick wall tiles and related precautions.
1. Quick Tips for Wall Tiles
First, add the cement to clean water and stir it at a ratio of 1:3.5. It is recommended to use mechanical agitation. The effect will be better. Then, let it stand for 5-10 minutes before use. Before use, stir it again to increase the strength.
Secondly, smear the glue on the base surface with a guillotine knife so that it is evenly distributed into strips. Note: Apply about one square at a time or it will easily dry the surface of the glue. Then, the back of the brick is directly kneaded on the base surface. In addition to the deeper or heavier stone on the back of the brick, in addition to touching the mortar on the base surface, the mortar should be touched on the back of the tile.
Then, position the tiles and keep the bricks aligned. Within 20 minutes after the tile adhesive is applied, the tile position can be adjusted to improve the engineering efficiency. Initially check whether the brick surface is flat and aligned. Bricks are clean and clean. Note: Before the clay is not solidified, it is better to clean the brick surface with a damp cloth. If it is more than 24 hours, it can be cleaned with a tile cleaner.
Finally, the tiles are caulked. Note: Do not mix dry cement before use. It is not appropriate to add cement and other materials to affect the effect. After filling, wait at least 15 minutes; then, use a damp cloth to clean the excess tile adhesive, caulking agent and other debris, and wait until the wall of the tile is dry.
2. Precautions for the laying of wall tiles
a. When the grassroots is being dealt with, all kinds of dirt on the wall should be cleaned first and one day watered and moistened. If the grass-roots level is a new wall, bricks, bullets, sticky-sandwich wall tiles should be used.
b. Tiles must be soaked in clean water for more than 2 hours before they are tiled. Bricks should not be bubbling and should be removed for drying.
c, when paving, encounter pipelines, lamps, switches, etc., must use a whole set of bricks to cut anastomosis, prohibit the use of non-whole brick patchwork paste.
d. The kitchen and toilet should have a gradient of water, no water, no water flow back. If the original waterproof layer is destroyed during construction, waterproof treatment shall be done. There is no leakage during the 12-hour test of accumulated water.
f. After the floor tiles are laid, bricks should be covered with cardboard, etc., and walk on the brick surface at least after 24 hours.
Xiao Bian concludes: The above is the introduction to the techniques of rapid wall tiles and the attention of laying tiles on the wall. Hopefully it can help the owners. After all, most of the owners are non-professionals, and a large number of equipment is to ask professional decoration masters to carry out the construction, but in the process of decoration, they play a supervisory role. To understand the technique of fast wall tiles in the above, etc. Very necessary.
Guide Roller Bearings,Track Roller Bearing,Rolling Bearing,Guide Wheel Bearing
Ningbo Borine Machinery Co.,Ltd. , https://www.borine-agroparts.com