How to decorate rough room blank room decoration process one by one to resolve

As we all know, in China's real estate market, new houses are generally sold as rough houses, so the owners have to carry out rough room renovation after they get a new house. However, for the renovation of laymen, rough house decoration is a complex major project. So how do we decorate the rough house? Here's just a look at the rough house renovation process with Xiao Bian.

First, the blank room renovation process - measuring area

Before the renovation, you must personally measure the indoor area and the area to be renovated. For example, the floor area, tiling area, etc., and then the size of the furniture to be clearly placed and the size of the ground. At the same time, it must be precise when measuring, which is very important for the later decoration. If the measurement is not accurate, it will directly affect the final decoration effect.

Second, rough room renovation process - the main demolition reform

The transformation of the main body is the first stage of construction, including the demolition of walls, shoveling of wall coverings, etc. In general, the construction framework of the interior is first put up.

Third, the rough room renovation process - hydropower reform

Before the hydropower reform, the dimensions of the cabinets are measured, so that the positions of the inlets and hood sockets can be reserved.

Fourth, rough room renovation process - tile, wood, by the work

Watts, wood, and the principle of who should be followed first should follow. When the bricklayers work on paving tiles, the overpass stone and marble window sills and floor drains are installed together. In general, when the bricklayers are ready to finish, the carpenters can play, because there is no conflict between the two. In the end, the oilworker entered the field to do the basic work on the wall and paint the wooden furniture.

Fifth, the rough room renovation process - kitchen and toilet ceiling

The ceiling of the kitchen and the bathroom can be said to be the first part of the installation process. When the ceiling is suspended, the kitchen fan and the bathroom heater should be installed.

Six, rough room renovation process - cabinet installation

After the ceiling is over, the cabinets can be installed. When installing the cabinets, the sinks, gas equipment, etc. must be installed together. At the same time, it is also possible to coordinate with the property to pass the gas. In this way, after the gas stove is installed, it can be tested.

Seven, rough room renovation process - wooden doors, wood floor installation

The door must be installed before wooden floors can be installed. At the same time, the period for making the wooden door is relatively long, so it is necessary to measure the size of the door before installation, so that it is not necessary to wait for the door to be installed. Secondly, when installing the wooden floor, first level the floor and keep the floor clean.

Eight, blank room renovation process - lighting installation

After the above steps are completed, lamps and sanitary ware can be installed, so that the preliminary decoration is completed. Followed by furniture, home appliances approach, furniture can be purchased according to the style of their own home.

Editor's summary: The above is about elaborating on the decoration process of rough house , hoping to help friends who are preparing to decorate. If you need to learn more about the rough house decoration, you can always pay attention to us, and the following articles will be more exciting.