Clear packaging repair traps strict supervision
Recently, a lot of friends have reported that the quality of their own home renovations has appeared to be big or small, and that they have done a lot with clear packaging. The following Xiaobian reminds friends who may need to be renovated: Pay attention to the top ten traps for clear packaging repairs, strictly supervise the construction process, and ensure good quality.
Brand shop: Wart plate Hettich hardware
Wall paint
Phenomenon: Latex paint is the most common wall decoration material. It can be painted, rolled or sprayed during construction. If the workers are not serious or perfunctory during construction, small color differences often occur. Especially the darker emulsion paint, this problem will occur even more.
Warmth Tip: Latex paint needs to be filled with some water before use, deployment of good latex paint to be used up once. Paints of the same color are also best painted once. If the wall needs to be repaired after construction, the whole wall should be repainted again.
Sewer line
Phenomenon: During the renovation of the construction team, construction waste containing a large amount of cement, sand, and concrete pieces is sometimes dumped into the sewers to save time. The direct consequence of this is a serious blockage of the sewer, causing the kitchen and toilet to run out of water due to poor water. Although some projects have no problems in the final acceptance, they always have problems with poor water.
Warmth Tip: Strictly supervise the construction team and cannot use the sewer as garbage roads. After the construction of the waterway is completed, all the basins, basins and bathtubs are filled with water, and then the water is discharged at the same time to see if the water is unobstructed and if there is any leakage of the pipeline.
Wire connector
Phenomenon: When the electrician installs sockets, switches, and lamps, it does not wire according to the construction requirements. In particular, when consumers use some electric appliances such as water heaters and air conditioners that consume large amounts of electricity, the switches and outlets are heated and even burned, which brings great economic losses to consumers.
Warmth Tip: In the construction supervision of the electrician in strict accordance with the operating procedures for construction, after all the switches, sockets installed after the actual use must be to see whether these parts have a fever phenomenon.
Wall tiles
Phenomenon: Paving tiles is a technical process. If workers cut corners, they are most prone to problems such as hollowing of tiles and misalignment. In addition, cement and adhesives used for paving ceramic tiles are also delicate. If the mix ratio is unreasonable, there will be problems such as falling off.
Warmth Tip: According to the Beijing Municipal Construction Committee promulgated the "family home decoration project quality acceptance standards", requires that the tile wall tile should be smooth and solid, clear patterns, no dirt and slurry marks, the surface color is basically the same, uniform seams, plate crack-free , Drop angles and missing edges, local emptying may not exceed 5% of the total.
Wall tick
Phenomenon: The buried pipeline must be slotted on the wall and the ground in order to bury the pipeline. A few workers perform barbaric construction during the grooving operation, which not only damages the building load-bearing structure, but also may cause damage to other nearby pipelines.
Warmth Tip: Prior to construction, it is necessary to reconfirm the direction and location of the pipeline with the construction team leader. The requirements for slotting are different for different wall structures. The wall in the house is not allowed to be slotted, and the wall with insulation after the slotting, it is easy to cause cracking on the surface, and in the ground slot, we must be careful not to damage the floor, to the residents downstairs Create trouble.
Seam modification
Phenomenon: In some places where the wall meets the door and the window, and where the two different colors of paint are docked, it is also where the workers often perfunctory. You will often see latex paint mixed with the paint at the docking station, causing various problems at the joints.
Warmth Tips: It is very important to deal with joints. You must supervise the construction of workers. If there are two colors of paint on the wall facing each other, it is necessary to apply adhesive tape on the edge of the first color during construction, and then apply another color of paint on it, so that the construction is completed. After tearing off the tape, the entire seam can be very neat.
Wire wear tube
Phenomenon: In the home improvement construction, almost all wires are put in PVC pipes and buried in the walls. Therefore, after the electric wire is put into the PVC pipe, the consumers cannot see it at all and it is difficult to replace it. If the worker is not careful in the operation, it will cause the wire to kink in the tube, causing electricity hazards. If the workers intentionally cut corners, they would use wire with connectors or put several wires in the same PVC pipe.
Warmth Tip: Consumers are advised to purchase their own wires, then supervise workers' operations at the site, and perform power-on tests after installation. In addition, consumers must allow the decoration team to leave a "pipeline map." When the electrician had just buried the wires in the wall, they had to number the walls and draw a plan. Then they used the strokes to draw the direction and the specific location of the wires, indicating the position on the floor, the ground and the adjacent wall. In particular, the position of the joints of the pipelines should be marked so that in the event of a fault, the line position can be found immediately.
Facet processing
Phenomenon: The so-called “small face†is a small place that some consumers can't see and can't pay much attention to, such as the upper edge of the door, the underside of the window sill, and the inside of the heating cover. Some workers will be here. If you cut corners, you will even do nothing.
Tenderness Tip: Remember that any object has 6 planes and do not ignore any details when checking the quality of the project
Ground leveling
Phenomenon: Some houses are not well-grounded and need to be re-leveled during the renovation. If the workers are not careful or intentionally sloppy, it will cause the problem of “more and more unevennessâ€, and the cement mortar used in construction will also greatly increase the ground load, causing hidden dangers to the safety of the building.
Warmth Tip: Before ground leveling, ground surface treatment must be done first, followed by cement mortar for leveling the ground. After the cement is dry, determine the flatness of the entire floor using a dedicated level ruler, and then proceed to the next step.
Substrate processing
Phenomenon: Before applying latex paint and paving wall tiles, be sure to do the substrate treatment. Some workers cut corners and cut materials in this regard during construction, and the unevenness caused uneven wall surface. After the paint is applied, there is a color difference. When the paint is applied, the paint is discolored and peeled off, or the ceramic tile is not firmly bonded.
The reason why a lot of friends fall into the trap is that they don’t understand the decoration and are fooled by the decoration company or construction staff. Another is that there is no time to supervise workers, and it is easy to take advantage of the lack of integrity of construction workers.
Links: Fashion bathroom decoration wallpaper paste master five principles
Home Furnishing Typography Entrance Decoration Children's Room Decoration Paint Lacquer Paint Cement Switch Decoration Find Decoration Company Okay Bathroom Tile Colors Bathroom Tiles Bathroom Tiles Bathroom Door Tiles Tiles Kitchen Tiles Ld Tiles
Neodymium Strong Magnets,Neodymium Coin Magnet,Black Coated Magnet
SDM Magnetics Co., Ltd. , http://www.lg-magnets.com